The Darby Outlook

Camp Darby

Good to know!

Tuscan Gnudi recipe

Learn how to cook Tuscan Gnudi gnocchi

Newcomer Info

Use ArMA site to submit work orders and maintenance requests

Maintenance Requests at U.S. Army Garrison Italy - Use the Army Maintenance Activity (ArMA) site to submit work orders and maintenance requests. Take Note: ArMA is on a new, more secure, home page: https://maintenance.army.mil

  • Bookmark this site (and forget about the former “ArmyMaintenance.com” version)
  • Submit issues with ease — just describe the problem and add a photo (photos speed up repairs by 25%!)
  • Unit leaders can track maintenance across all their buildings.
  • Open to any registered user on Army installations.
  • Whether it’s a leaky faucet or a broken light, ArMA makes reporting fast, simple, and effective.
  • Head to https://maintenance.army.mil

Alerts and Closures

  • Learn about service hour changes and local alerts
    Learn about service hour changes and local alerts

Camp Darby Community Advisory – Livorno

Heads up! A labor union protest is scheduled in Livorno on Saturday, Oct. 3 from 9 a.m. to 1 p.m. More than 500 participants are expected. The march route has not yet been announced. Traffic disruptions are possible. If you’re in Livorno, avoid protesters. Use alternate routes and remain aware of your surroundings. Do not engage with demonstrators. In an emergency, call 112 or the Camp Darby MP Desk at 050-965-8202.

------------------------------------------------------------------------------------------------------------------------------

The DEERS office will be closed from 1 October through October 14th 2026 and will reopen on October 15th 2026.

Please schedule all appointments online during this time.

---------------------------------------------------------------------------------------------------------------------------

Beginning on 23SEP until ~07OCT, DPW will conduct cleaning/sanitation activities in Building 113 Lobby Area and certain office spaces in the eastern portion of the building. To expedite their work, the below offices will temporarily be re-located and/or tele-work. Please utilize the contact information and/or Outlook to effectively communicate with them:

Ms. Bianchi and Ms. Cicchitti

DSN – 645-8160 or 645-8164 (call forward enabled)

Patient Liaison

Ms. Lama, Mr. Castaldo, Ms. Ballucchi, Ms. Guerrini

DSN – 645-8255 (call forward enabled for urgent matters). For routine matters please email

Army Substance Abuse Program (ASAP)/CR2

Ms. Rodriguez Ramirez

DSN – 645-8249 (call forwarded enabled)

Independent Duty Medical Tech (IDMT)

TSgt Keyes

Internal to 731st MUNS; Standby for Access To Care

School Liaison Officer (SLO)

Ms. Kandell

DSN – 645-8237 (located at CYS building)

Sexual Harassment & Response Prevention (SHARP)/SAPR Victim Advocate

Ms. Rivera

+39-335-661-9696 (24/7 Helpline)

Personal Affairs Liaison (Soggiorno)

Ms. Ferrara

DSN – 645-8252; physical location: Bldg 113, Room 60 (old Finance Office)

The Installation Access Control Office (IACO) will be accessible by a work window inside the North Entrance. North, South, and West doors will be available to access the rest of the building’s offices.

-----------------------------------------------------------------------------------------------------------------------------

The Camp Darby Casa Toscana Hotel will begin renovations mid-September. Although the construction work will limit room availability for a temporary basis, the end-state will meet safety standards to safeguard families and guests.

What: Two-Phased Hotel Renovation

Where: Bldg 202, Casa Toscana Hotel

When: 14SEP26 to 30MAY27

Why: The primary purpose of the work is to bring the building up to Fire Code Compliance and US/ITA fire prevention standards. Secondarily, work will refresh the facility’s exterior and outside walkway

The renovation work will be conducted in Two Phases:

  1. Phase One: Upper Floor will include all 14 rooms, stairwells, and rooms 201/202. Prep work will begin on 13SEP. The exact completion date of this phase, TBD. 
  2. Phase Two: Lower Floor to include all six rooms, laundry/supply areas, and Reception Area (our front desk will transition to the southern end of the building in rooms 201/202).
  3. During the entire construction operational hours will remain the same. 

Room allocation will be prioritized to operational requirements, ie PCS transition moves. Leisure travel will be space availability. Casa Toscana will provide Statement of Non-Availability (SNA) when occupancy is full.

Any questions, please direct them to Mr. Daniel Wilcox:

------------------------------------------------------------------------------------------------------------------------------