Army approves Milestone C and awards LRIP contract for the Mobile Protected Firepower program

By ASA(ALT)June 29, 2022

1 / 2 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
2 / 2 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL

WASHINGTON – The Army announced today the award of a $1.14 billion contract to General Dynamics Land Systems, Sterling Heights, Michigan, for the production and fielding of up to 96 Mobile Protected Firepower vehicles. The award comes just days after the Army closed out the MPF middle-tier-acquisition rapid-prototyping phase and transitioned to a major capability acquisition program with a favorable Milestone C decision – an incremental step in the Department of Defense’s acquisition process that moves into the production and deployment phase.

MPF will provide infantry brigades greater survivability, the ability to identify threat systems earlier and at greater distances, and will not restrict movement in off-road terrain. MPF will also allow Soldiers to move at a faster pace, protecting the assaulting force.

“The MPF program did exactly what the Army asked, which was to complete a competitive and accelerated rapid prototyping effort with Soldier touchpoints,” said Mr. Doug Bush, Assistant Secretary of the Army for Acquisition, Logistics and Technology, and the Army’s acquisition executive. “MPF is a benchmark program, as the acquisition and requirement communities worked together to complete the MTA RP phase and move this system into production in just under four years.”

The Milestone C decision came on schedule and was underpinned by strong support and overwhelming commitment from Army leadership.

“MPF represents a new capability for the Army, allowing our light maneuver forces to overmatch adversaries. Through multiple Soldier touchpoints, our Soldiers have operated the prototypes and provided crucial feedback to the design team, ensuring our forces will have the asset they need on the future battlefield,” said Maj. Gen. Ross Coffman, director of the Next Generation Combat Vehicles Cross Functional Team.

During the MTA RP phase, the Army successfully tested and evaluated 24 prototypes during a pandemic. MTA authorities allow the Army to have the flexibility to get prototypes into Soldiers’ hands quickly to enable fidelity on known risks and develop informed plans moving forward.

“Congress has provided us with flexible MTA legislation that allows for accelerated prototype delivery and Soldier operational feedback, which expedites the fidelity on technical and programmatic risks to better inform program acquisition decisions,” Bush said.

The MPF will be the Army’s first new design vehicle fielded in over four decades, with first unit equipped planned for late fiscal year 2025.

“Today’s announcement sets in motion an important modernization effort for the Army. As a team we’ve worked diligently to make certain we’ve taken the right steps early on to accept risk where appropriate and move faster,” said Brig. Gen. Glenn Dean, ASA(ALT)’s program executive officer for ground combat systems. “The Army is committed to delivering the MPF capability to the infantry brigade on an accelerated schedule with incremental improvements over time.”

During the LRIP phase the Army will take delivery of MPF vehicles and conduct production qualification testing to include lethality, mobility, survivability, full-up system live-fire, and RAM testing. Additionally, an initial operational test and evaluation will also be conducted, all leading to the first unit equipped. The award of subsequent LRIP vehicle options will be based on review of cost, schedule and performance metrics defined in the acquisition program baseline.