Bridging the Euphrates

By www.Army.milNovember 27, 2007

The Soldiers float each section into the river for assembly.
1 / 4 Show Caption + Hide Caption – The Soldiers float each section into the river for assembly. (Photo Credit: Spc. Luke Thornberry) VIEW ORIGINAL
Soldiers build a causeway in the shallow part of the river.
2 / 4 Show Caption + Hide Caption – Soldiers build a causeway in the shallow part of the river. (Photo Credit: Spc. Luke Thornberry) VIEW ORIGINAL
A truck tests the bridge, moving from the causeway and onto the first section.
3 / 4 Show Caption + Hide Caption – A truck tests the bridge, moving from the causeway and onto the first section. (Photo Credit: Spc. Luke Thornberry) VIEW ORIGINAL
The Army engineers make some adjustments to the bridge, which will carry many troops and vehicles.
4 / 4 Show Caption + Hide Caption – The Army engineers make some adjustments to the bridge, which will carry many troops and vehicles. (Photo Credit: Spc. Luke Thornberry) VIEW ORIGINAL