1 / 4Show Caption +Hide Caption –
Rows of equipment belonging to 3rd Brigade, 25th Infantry Division await transport to Schofield Barracks on Nov. 30 after being off-loaded from the Motor Vessel American Tern at Pearl Harbor, Hawaii. The 25th Infantry Division's Third Brigade and the...
(Photo Credit: U.S. Army)VIEW ORIGINAL2 / 4Show Caption +Hide Caption –
Nefftaly Lugardo, 599th Transportation Group information technology specialist, checks that his computer is keeping track of cargo and equipment exiting the Motor Vessel American Tern during the off-load of 25th Infantry Division equipment at Pearl H...
(Photo Credit: U.S. Army)VIEW ORIGINAL3 / 4Show Caption +Hide Caption –
John Manahane (left), 599th Transportation Group transportation specialist, writes down cargo numbers as Navy Cargo Handling Battalion 3 from Alameda, Calif., offloads equipment from MV American Tern during the 25th Infantry Division vessel offload a...
(Photo Credit: U.S. Army)VIEW ORIGINAL4 / 4Show Caption +Hide Caption –
Members of the 599th Transportation Group off-load 3rd Brigade, 25th Infantry Division cargo and equipment from the Motor Vessel American Tern at Pearl Harbor, Hawaii, Nov. 30. The 25th Infantry Division\'s Third Brigade and the division's headquarte...
(Photo Credit: U.S. Army)VIEW ORIGINAL
Social Sharing