Rip-Rap and Fencing
Photo Credit: Courtesy Fort Bragg
Fort Bragg personnel inspect riprap and fencing installed as part of the first phase of surface water remediation at solid waste management units. Water treatment measures will be installed, as necessary, in the stream in a phased approach. The first two phases - installing rip rap and small drop structures - are passive treatment measures, while the last two phases - forced air sparging and fountain aeration - will be active measures. This remedial action will result in an estimated $600,000 lifecycle cost savings over the projected 30-year monitoring period for the site.
Page last updated Tue March 31st, 2009 at 14:50