Repairs continue on Fort Irwin flood-damaged builidings
Photo Credit: Les Ozawa
J&K Drywall construction workers remove damaged dry wall panels as part of general contractor Betance's work to repair electrical, wall and floor damage to Building 273. The building's basement was flooded, requiring repairs to the mechanical room's air-conditioning, electrical and heating system that feed into two other barracks buildings, rendering them also uninhabitable.
Page last updated Tue December 24th, 2013 at 00:00