This year the AZARNG opened up a pilot program solar parking lot. The 20-car site provides covered parking for vehicles, and the top of the parking structure is covered in solar panels. The solar array has a capacity of 44.5 kW DC peak, expected to produce 75,000kWh/Year.
Page last updated Fri April 19th, 2013 at 00:00