PEO C3T Lean Six Sigma project leads to almost $10 million in cost savings
Photo Credit: U.S. Army Photo
Kevin Joyce, a logistics specialist with Project Manager Warfighter Information Network-Tactical (WIN-T), reexamined how laptops were being reset within Army WIN-T units as part of a Lean Six Sigma project.
Page last updated Thu December 6th, 2012 at 00:00