Joint Logistics Over the Shore: Waterborne Soldiers - The Force Behind the Trident
Photo Credit: Sgt. Edwin Rodriguez, 7th Sustainment Brigade
A bulldozer is used to make a duck pond, a water-filled ditch that will allow the pier to extend beyond the shore above the current sea level, before the Trident Pier can be installed during the preliminary stages of Joint Logistics-Over-the-Shore exercise Aug.17 at Fort Story, Va.
Page last updated Thu August 30th, 2012 at 00:00