Stream Pipe System At Redstone Arsenal
Photo Credit: Kari Hawkins, USAG Redstone
Chugach employee Chris Payne monitors electrical output as he turns on the switch gear for electricity at the Prototype Integration Facility. The facility is one of more than 600 occupied buildings at the Arsenal that had to be powered up once electricity was made available.
Page last updated Wed May 11th, 2011 at 11:53