Taping dry wall
Photo Credit: Mr. Stephen Baack (IMCOM)
Juan Sanchez, a taper with SUNDT Construction, stands on stilts Sept. 17 as he works on the second floor ceiling in the main building of the Warrior Transition Complex, a project slated for completion Feb. 15, 2011.
Page last updated Fri September 17th, 2010 at 20:49