Buiding the pier
Photo Credit: Master Sgt. Toby M. Valadie
Louisiana National Guardsmen of the 2225th Multi-Role Bridge Company, 205th Engineer Battalion, construct a 300-foot temporary wharf that will be used to load boats with booms and supplies at Campo's Marina in St. Bernard, La., on May 6.
Page last updated Fri May 7th, 2010 at 14:03