Blue Grass Chemical Agent-Destruction Pilot Plant - Construction Photos - September 2011

By Ms Kristen Szydloski (AMC)September 28, 2011

Control and Support Building
1 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Control and Support Building
2 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Munitions Demilitarization Building
3 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Supercritical Water Oxidation Building
4 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Utility Building
5 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Laboratory Building
6 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Current Project Staffing
7 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Utility Building
8 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Munitions Demilitarization Building
9 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Munitions Demilitarization Building
10 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL
Laboratory Building
11 / 11 Show Caption + Hide Caption – (Photo Credit: U.S. Army) VIEW ORIGINAL

The Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will safely destroy 523 tons of chemical agent in rockets and artillery projectiles stored at the Blue Grass Army Depot in Richmond, Kentucky.

The technology selected by the Department of Defense to destroy the Blue Grass chemical stockpile is neutralization followed by Super Critical Water Oxidation (SCWO).

The Program Manager, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in both Kentucky and Colorado.

The Bechtel Parsons Blue Grass Team, a joint venture of Bechtel National, Inc. and Parsons Infrastructure and Technology Group, along with teaming partners Washington Demilitarization Company, Battelle Memorial Institute, General Atomics and General Physics, is the systems contractor selected to design, build, systemize, pilot test, operate and close BGCAPP.

Related Links:

ACWA on Twitter

ACWA on Facebook

ACWA on Flickr

ACWA on YouTube