• Components of the first Projectile Mortar Disassembly system have arrived at the PCAPP site. Ironworkers and Millwrights have begun assembling the system in the Explosion Containment Room.

    First-of-A-Kind Equipment

    Components of the first Projectile Mortar Disassembly system have arrived at the PCAPP site. Ironworkers and Millwrights have begun assembling the system in the Explosion Containment Room.

  • Miniature chemical agent monitors, known as Minicams, will be located in these brown monitoring houses. Minicams will monitor the air going through the filters for agent contamination.

    Agent Filtration Area

    Miniature chemical agent monitors, known as Minicams, will be located in these brown monitoring houses. Minicams will monitor the air going through the filters for agent contamination.

  • The Standby Diesel Generator's cooling tower (right) sits adjacent to the generator. The generator will supply backup power to the plant.

    Standby Diesel Generator

    The Standby Diesel Generator's cooling tower (right) sits adjacent to the generator. The generator will supply backup power to the plant.

  • Frames await their explosion-resistant windows inside the Entry Control Facility. The Entry Control Facility will be the first point of entry into the Chemical Limited Area.

    Control and Support Building

    Frames await their explosion-resistant windows inside the Entry Control Facility. The Entry Control Facility will be the first point of entry into the Chemical Limited Area.