• Siding is up on the Control and Support Building, allowing workers to install HVAC, fire protection and frame the interior walls.

    Control and Support Building

    Siding is up on the Control and Support Building, allowing workers to install HVAC, fire protection and frame the interior walls.

  • Three hydrolysate tanks await primer. The tanks can hold over 285,000 gallons each.

    Biotreatment Area

    Three hydrolysate tanks await primer. The tanks can hold over 285,000 gallons each.

  • Workers install foundation mats for the Immobilized Cell Bioreactors. The Brine Concentrator Feed Tanks are pictured in the background.

    Biotreatment Area

    Workers install foundation mats for the Immobilized Cell Bioreactors. The Brine Concentrator Feed Tanks are pictured in the background.

  • Two 90-foot Munitions Treatment Units are in place in the now fully enclosed Agent Processing Building.

    Agent Processing Building

    Two 90-foot Munitions Treatment Units are in place in the now fully enclosed Agent Processing Building.

  • All 10 units (two are back up units) are in place in the Agent Flitration Area.

    Agent Filtration Area

    All 10 units (two are back up units) are in place in the Agent Flitration Area.

  • Work continues in the Enhanced Reconfiguration Building with installation of HVAC and interior composite walls.

    Enhanced Reconfiguration Building

    Work continues in the Enhanced Reconfiguration Building with installation of HVAC and interior composite walls.